Dosing scale instrument maintenance

2019-04-17

Batching scale instrument maintenance is suitable for the control of belt scales of various forms and ranges, and is used for the control of various forms of dynamic scales such as reamer scales, disc scales and rotor scales. The batching scale instrument is a microcomputer belt scale. Scale weighing display special instrument, weighing display single-chip microprocessor as the core, simple operation, complete functions, reliable operation; 3 idler, 4 idler fully suspended electronic belt scale, batching scale instrument batching system is used together. In order to meet the According to different customer needs, the batching scale instrument supports customer customization of the instrument.

六种物料配料秤一体机 AMC501-B1

Dosing scale instrument maintenance

Dosing scale meterIt is a high-performance control instrument specially designed for belt scales. It adopts anti-interference measures and a number of single-chip research results. It has the characteristics of powerful functions, small size, high reliability and strong adaptability. The instrument is suitable for the following control systems :

1. The quantitative feeder controls the flow by controlling the belt speed of the feeder or pre-feeding.

2. The belt scale controls the belt load through the belt speed, thereby controlling the flow.

Dosing scale instrument maintenance:

配料模块

1. The batching scale instrument needs to be in a dry, dust-free place, preferably with a desiccant, moisture-proof, moisture-proof, and the instrument with a battery should be taken out of the battery when not in use, and the battery with a rechargeable battery should be taken out and stored after it is fully charged.

2, good lubrication, refuel or change oil on time, continuous oil, no dry friction, normal oil pressure, bright oil mark, smooth oil passage, oil quality meets requirements, oil gun, oil cup, and linoleum are clean;

3. Damage and corrosion of the instrument body and connecting parts of the batching scale;

4. Regularly lubricate, drain, exhaust, drain, check isolation fluid and check for antifreeze and anti-condensation in winter;

5. Regularly clean the process computer control system thoroughly and thoroughly, clean the cabinets, cabinet room air conditioners, printing equipment, hard disk drives, etc., clean the filters, and regularly perform data backup, etc.;

6. Comply with the safety operation rules, do not overload the equipment, the safety protection devices of the equipment are complete and reliable, and the unsafe factors can be eliminated in time.


Related News

Product Recommended

  • Dual Channel Pneumati...
  • Single-channel pneuma...
  • Dual-channel quantita...
  • Anpu measurement and ...